An interim station was built and located adjacent to the Authority's 3-mg ground tank on a remote site that has minimal available electrical infrastructure. The engineering team opted to use Global Pump diesel-fueled pumps with a rated capacity of 29 mgd. Read More...
MERSINO's extensive dewatering project had gone into the maintenance stage at Smithland, Kentucky, while the contractor continues work on a $430 million hydroelectric generating facility. Read More...
In freezing temperatures, an unexpected collapse of the water inlet pipe resulted in a complete shutdown of operations at Praxairs' processing plant on the Detroit River. Read More...
Decreasing water table elevations in the Rouge River resulted in increased river water temperature, creating a risk for explosion at the steel plant when using river water for cooling its process systems. Read More...
The bypass requirements for the relining of a 30 in. sewer line running under a railroad track included the problem of running the temporary bypass under a railroad bridge for direct access to the discharge point. Read More...